Back to EPR Bullets by AFSC |
![]() |
- Army infantry trained; excelled at convoy ops/urban tactics/advanced battle skills--ready for 2009 deployment
- Aced Combat Skills Trng Ft MCcoy, WI; combat life saver/convoy/weapons trng crit to Joint Svs AOR msn
- Led gravel haul team--moved 900 tns mat'l/supported Flos taxiway Navy project-- deadlines 100% on track
- Escort/ensured delivery of 900 tns of base course/select fill material for FLOLS afld proj--zero msn delays!
- Lead craftsman $475K Alpha- Zula tie-in proj; excavated 880 CM fill material--kept flying mission on sched
- Supervised 7 peers w/constr of $475K Alpha-Zula taxiway tie-in--RH #1 priority--battlefield ops ctr for afld
- Coordinated delivery of over 2K yds of base course fill material for Alpha-Zula $475K project--zero delays!
- Vital leader; supervised/ensured 180' trench was dug for new afld lighting--supported the new Alpha-Zula proj
- BAF NCO work horse of the Month! placed 1280 tns of material; set 330 ft of forms for BAF #1 priority proj
- Assisted DCP analysis/acquire CBR soil data $475K Alpha-Zulu proj--crucial for planning/meet requirement
- Led crew of six; set 3K linear ft of concrete forms for $475K proj for BAF #1 afld priority--kept proj on target
- Placed 300 + ft expansion board/finished 1220 CM of concrete for $475K project for BAF #1 airfield priority
- Led 8 pers w/construction of $475K Alpha-Zula tie-in; placed 1220 CM concrete--completed proj in 40 days
- Expertly sawcut/sealed/routed 5K ft for BAF #1 afld project; $475K Alpha-Zula tie-in --zero mishap incidents
- Supervised installation of backer rod/sealant for $475 Alpha-Zula ramp project--completed ahead of schedule
- Oversaw grading of 1K CM of base course; placed 432 CM of concrete--comp'd Bravo Keyhole proj in 3 wks
- Deployed 190 days to Bagram AB, as Airfield team leader directly supt'd OEF/OIF construction operations!
- Supervised 14 pers w/constr of $699K Bravo Keyhole--cleared 1K CM of terrain; placed 432 CM concrete!!!
- Supervised installation/alignment of 2K ft 12" concrete forms--created add'l ramp space to spt C-12 ISR msn
- Led 2 pers crew for 2K lf joint on $699K Bravo Keyhole project--prevented moisture intrusion into pavement
- Managed/mentored five Amn in upgrade training while deployed; ensured OJT/CDCs completed w/ 88% avg
- Oversaw $1.8M (LAMS) Large Area Maint Shelter pad-- created 108K sft parking taxiway for UH-60 Helo's
- Coordinated placement/finish of 42 cm conc for RH K-Span parking apron; created add'l parking for RH Mbr's
- Led eight AMN/finished 118 CM concrete for RH bed down proj--created 7K sq ft of new RH living facility!- Planned/programmed/surveyed $5.4M worth of future constr; reviewed/corrected 6 designs/BOMs w/in 3 dys
- Multi-skilled Amn; modified 5 B-huts in 3 days; constructed 44 rms; ensured adequate living cond for RH pers
- Excavated/hauled 80K tns of mat'l; spread/compacted 300 tns of base course; fast-tracked 3 projs/$3.4M const
- Designed/constructed $796K comm fac; req'd for ILS/TACAN mx/sup't; 3X area/increased msn capability/ops
- Orchestrated shipment of 43 tns of matls/equip to 4 FOBs; critical to 6 USFOR-A projs/$2.8M worth of const
- AOR Sole machinist! Forward deployed to retrofit mast for well drilling rig--$200K replacement cost saved
- Catalyst! Completed $699K arfld const; increased arcft parking 130%enabled first MC-12W/ISR msn in OEF
- Strictly managed 80 vehicles/equip worth $8.1M; ordered $12K replace't prts/MC rate 95%; zero msn delays
- Multi-crafted Amn! Fabricated 45K lbs of steel/seamed 63 arches/erected 21 picks in 3 days; sup't $764K proj
- Team focused; delivered daily meals to 3 jobsites; acquired $300K mat'ls at CL IV; renewed $43K veh lease
- Outstanding Amn! Clearly exceeded primary duty expectations/standards of conduct during entire deployment
- Deployed 150+ days to Contingency Operating Base Speicher and Tal Afar, Iraq...directly empowered OIF
- Excelled at 30-day rigorous Combat Skills Trng at Fort McCoy, WI--ready for multi-svc missions AOR wide
- Const'd 1.5 mile rd FOB Speicher; placed 2.7K tns asphalt; $750K proj elim'd dust hazard for 1K+ vehs daily
- Key contributor on $746K OH-58 ramp project--placed 3.2K yds of concrete; expanded parking for 10 helo's
- Placed/compacted 5.2K yards base course; prep'd 140K sq' OH-58 ramp; extended COB Speicher helo cap's
- Installed 8.4K ft forms; ensured precision alignment; allowed placement of 3.2K yds concrete on OH-58 ramp
- Skillfully operated concrete saw; widened 5.8K+ ft of concrete contraction joints; eliminated water intrusion
- Superb craftsman; placed 180 tns asphalt for 12' shoulder; reduced dust...improved visibility for UH-60 helo's
- Forward deployed to Tal Afar; milled/overlaid 560K sq' runway; $2.1M proj increased acft load limit 25%
- Asphalt expert; paved 9.4K tns asphalt on Tal Afar rwy; deterred imminent afld closure; 4K+ psnl resupplied
- Superb dump truck oper; hauled 4K yds of asphalt millings for Tal Afar runway proj; ops complete in 15 days
- Installed 500 ft HESCO barriers at Tal Afar AF ECP; increased FP measures = 470 dump trucks safely insp
- Best roller oper! Compacted 9.4K tons asphalt; minimized cold joints--exceeded airfield smoothness criteria
- Deployed 225 days; led 46 CLP msns--delivered $45M in materials; supported RH constr on 4 major FOBs
- Spt'd $17M FOB Dwyer runway proj; transported Gomaco Airfield Paver across hostile enemy Afghan terrain
- Assisted w/$4.5M KAF AM-2 mat Mustang Ramp expansion--protected 33 Apache's acrft worth over $528M
- Expertly placed 500 tns base crse; erected 2/$600K K-Spans; provided new 16K sq ft RH secure storage area
- Led demolition/clearing effort; 3 mile section; Eglin AFB developed inter-service IED avoidance training crse
- True leader; worked w/EA's; marked 21K sq ft new bldgs--key for 2 KAF proj's start on time w/zero delays
- Mbr haul team; placed/graded 60 tons of gravel; improved work area/drainage for mx facility--Qol 14+ Amn
- Born leader! Ordered driver to push in "Kill Zone" during enemy small arms attack; no CLP injuries 35+ Amn
- Identified shortfalls for HD pallets/equip--ID'd $110K shortfalls--ensured Sq rdy for 2010 HQ ACC 10' ORI
- Measured/weighed/validated 140 increments for processing--established UTC compliance for ACC standards
- Lead increment mgr for D-flight; 18 increments packaged; 100% success for 18 folders/equipment items tasked
- Loader operator on ADR team; led to '10 ORI Excellent Flight rating--secured Sq ovarall rating "Satisfactory"
- Outstanding NCO; unloaded 9 pcs priority equip from C-130 acft; supported $6.1M Afghan Theater Ops projs- Warrior ready; deployed 179 days to Joint Base Balad, Iraq in support of OIF--sustained high AF ops tempo
- Deployed 183 days to Al Dhafra AB, UAE supporting OIF/OEF/Combined Joint Task Force - Horn of Africa
- Expertly replaced damaged 410K watt generator; ensured lighting for 11M sf airfield; secured $12B+ aircraft
- Expediently built base for 60K lb mobile shooting range; graded 50 tn gravel--kept 250 SF weapons proficient
- Skillfully prepped 40K sf site/flightline DFAC; leveled 1K tons base course--saved $133K/compl'd in 5 days
- Mastered grader elevation control system; section to take on foundation projects; saved $130K dorm project
- Led concrete placement for fuel pumps; provided hardened surface for enduring operations supporting GWOT
OTHER ACCOMPLISHMENTS:
- Served as VCNO; managed 100 vehicle fleet; fabricated water trailer--enabled return of $30K monthly rental
- Const 6-acre sports ctr; softball/basketball/volleyball; morale boost for 1.9K--Nov '07 MSG Team of Month



Contact editor@airforcewriter.com Use of website constitutes acceptance of terms