- Shined as interim Infrastructure Supt! Led 75 prsnl/three AFSC's; testimony to ldrship abilities--promote now!
- Volunteered to coach base youth baseball; promoted fun/fair play--positive role model for kids base wide
- Repaired damaged 8" line in Phantom East, ensured constant operational water pressure to 3K base occupants
- Removed/replaced damaged in-ground grease trap for Oasis dinning facility, restored facilities ops 100%
- Contributed to opening of two new laundry facilities by installing sixty new appliances, improved base QoL
- Participated in repair of damaged sections of local host nation comm line, averted $40K+ in contracting costs
- Performed RWP on 6 laundry facilities and 4 dorm buildings, maintained higher QoL for 3K base occupants
- Volunteered to work at Thirsty Camel serving customers and checking ID cards, contributed to overall morale
- Terminated 332 leaks in 16 dormitory bays; replaced 80 shower units--completed AEW/CC's #1 QoL issue
- Rapidly constructed emergency water supply line; laid 700 lf pipe--restored vital water supply within 12 hrs
- Led crew in washrack project; installed waterline/manifold for AGE equipment--360 pieces valued at $7.5M
- Completed 484 job orders/12 emergencies/5K RWP inspections in 122 facilities--upheld $27M infrastructure
- Eradicated four water tanks; installed 135 l/f of water line to COMM base hub--saved 20K maintenance costs
- Trenched/installed 475 l/f waterline; vital water source to ADAB sport complex--setting the standard in AOR
- Completed 23 fire suppression system inspections; performed weekly/monthly maintenance--restored to 100%
- Installed 2" gate valve; ensured filling of vital 128k gal airfield fire suppression tank--protected $1B in assets
- Devised new fuel receipt; installed 240 ft of line--319K gpd increased to 532K/reduced offloading time 40%
- Modified 12 hydrant outlet valves; installed revised valve controls--reduced POL manning 50%/saved $120K
- Maintained $127M fuel sys; closed 29 vital repairs/delivered 56M gal--upheld #1 mission/best in CENTAF
- Revived 6 pantographs; added pneumatic conversions--provided secondary fuel service module/saved $80K
- Overhauled two filter separators; replaced 14 elements filtering 90% of wings fuel--ensured 4,548 Sorties
- Installed portable fuel system after JPTS pumps failed; 100% operational in 6 hrs--U2 mission uninterrupted!
- Restored fuel hydraulic verification; synchronized computer with pump logic controls--protected $1B aircraft
- Pressure tested base fuel storage receipt system; discovered/isolated two fuel leaks--abolished 3K gpd spill
- Revamped 80-2nd floor dorm showers in 40 days; ceased 432 leaks--solved wing's #1 QoL for 1,800 Airmen
- Revived 6 pantographs; added pneumatic conversions--provided secondary fuel service module/saved $80K
- Maintained $127M fuel system; completed 7 critical repairs/delivered 14 M gal--fulfilled Wing's #1 mission
- Completed 124 job orders/12 emergencies/5K RWP inspections in 122 facilities--upheld $27M infrastructure
- Refurbished 19 washers and dryers; reduced disposal rate from 100% to 0%--saved $9K in replacement costs
- Corrected critical flaw at bases' only pump station; reestablished bases' water pressure--increased psi 180%
- Finalized utilities map updates; identified and surveyed 642 GEOBASE GPS points--map accuracy up 95%
- Repaired three ruptured water mains at ECS; halted infiltration in comm vault--corrosion stopped to main hub
- Coordinated w/Emeratie; isolated water valve/repaired rupture--acquired 2nd water source expansion rights
- Replaced one/rebuilt three inoperative fire hydrants; increased fire protection 20%--safeguarded 24 facilities
- Completed 127 J/Os in first 28 days; remarkably thwarted 7 critical emergencies--reduced backlog by 66%
- Directed flight line fire sys repairs after 2 yr O/S; restored defense to $1.7B assets--63 AC/facilities protected
- Managed DFAC U/V wtr sys revamp; rendered safe after 6K hrs neglect--protected 2K airmen/saved $5.5K
- Instructed washer/dryer repair program; refurbished 80% of units formerly disposed of--saved $35K annually
- Created/initiated utility sys RWP; performed 1K+ itemized inspections to 44 facilities--reduced J/O calls 50%
- Piloted revamping of dorm showers; abolishing leaks from upper to lower floors--QoL boost/preserved $8M
- Commanded 60 dryer vent replacements/screen cleanings; stopped fire hazard/improved facility cooling 60%
- Led repair to force sewage main rupture; replaced split piping--eliminated 800 sq ft of bacteria infested soil
- #1 of 597 38 CSW Airmen! Won Airman of the Quarter for 3rd Qtr 2006--sets standard for a true professional
- Deployed 45 days to Nicaragua; completed $256K in projects--new school/clinic raised QoL for 600 locals
- Saved $70K in bottled water; operated 2 water purification units--made 20K gallons daily for camp personnel
- Installed pressure tank/6K ft of line from water well to base camp--improved shower/laundry water pressure
- Led fire hydrant replacement; ensured 100% fire coverage for AAFES warehouse--$200M in assets protected
- Directed 2-person team to repair 18" storm drain; cleared 330 lbs of debris--avoided flooding to 7 facilities
- Electronically mapped 400 water main valves; KMC database updated--ensured quick id/isolation possible
- Led 3-person water main repair crew; directed damaged line exposure/fix--prevented $4K vs contractor cost
- Spearheaded MFH main sewer stoppage; quickly unclogged 3 manholes--zero interruptions to 4.2K residents
- Completed CDC's XX months early; upgrade trng 100%; earned 12 college credits w/3.5 GPA towards CCAF
- Graduated 40-hr water purification unit trng; proven under fire--kept aging units operational during deployment
- Certified Heartsaver AED instructor; trained 30 Airmen--prepared to respond to life-threatening emergencies
OTHER ACCOMPLISHMENTS:
- Passed CLEP and engaged in two upper level on-line courses; 75% complete with BS in Ecological Controls
- Orchestrated 25 airmen PT plan; visible progress w/80% of participants--reduced his 4-mile run time by 25%
- Gave 30 hrs to KMC AADD program--saved 12 careers...built and manned unit haunted house--raised $2.4K
- Volunteered 20 hrs at skate park--taught 32 teens basic skills...sorted 2K lbs of postal mail--kept msn flowing
- Visited 2 Nicaraguan orphanages; presented over $500 of toys/sports equipment--solidified community support
- Deployed 45 days to Nicaragua; completed $256K in projects--new school/clinic raised QoL for 600 locals
- Operated 2 ROWPU units; made 20K gallons daily for camp personnel--Saved $70K in bottled water contracts
- Installed pressure tank/6K ft of line from water well to base camp--improved shower/laundry water pressure
- Conducted security patrols on four deep wells/two reservoirs; protected potable water for 2.8K MFH facilities
- Volunteered to work 30+ hrs with AADD; transported 12 inebriated airmen to their homes--careers/lives saved
- Coined by Vice CC 86th Aeromedical Evac sq; photographed prior CC's retirement ceremony--selfless airman!
- Enrolled at University of Maryland; finished 4 courses w/3.5 GPA--merited 12 college credits towards CCAF
- Continously excelled in OJT/upgrade training; scored 79% on CDC EOC exam--completed 1 month in advance
- Led 3 person water 4" main repair crew; directed damaged line exposure/fix--prevented $4k vs contractor cost
- Hand picked CSW Airman! Won Airman of the Quarter third Qtr 2006--sets the standard for a true professional
- Led fire hydrant replacement; ensured 100% fire coverage for AAFES warehouse--$200M assets protected
- Electronically mapped 400 water main valves; KMC database updated--ensured quick id/isolation possible
- Directed 2-person team to repair 18" storm drain; cleared 330 lbs of debris--avoided flooding to 7 facilities
- Deployed 129 days Al Udeid AB in support of OIF & OEF; delivered 1.8M gallons of water to 32 water tanks
- Performed RWP on 64 cadillac latrines; inspected/repaired all faulty fixtures--extended each facilities service
- Removed/replaced damaged in-ground sewage tank for CAOC dinning facility--restored facilities ops 100%
- Completed CDCs 1 month ahead of schedule; tested 88% on end of course exam--ready to accomplish CCAF!
- Attd 40-hrs of ROWPU trng; accuired skills needed to operate in an expeditionary environment--GWOT ready
- Aided in facility excellence program; 100+ hours of base beautification--enhanced installation appearance/QoL
- Participated in squadron intramural basketball--American league champions--earned 23 points toward CC cup!
- Good work ethic; tackles any task above his skill level w/outstanding results--promotion to SrA recommended
- A well rounded individual, supports/encourages participation in squadron and community activities--wingman!
- Assisted in water main repair at AAFES; 48 hrs around-the-clock ops--minimal impact to 16K weekly patrons
- Maintained air pressure tanks at two facilities; suppression sys 100% operational--lives/$9M assets protected
- Replaced faulty sprinkler head at gym's sport field; achieved total zone coverage--boosted morale of 2K users