Back to EPR Bullets by AFSC

Air Force EPR Bullets


EPR Bullet Statement Examples

Quality Assurance/QA

- Processed 215 technical evaluations; ensured unit compliance/quality--completed 97% of required evaluations

- Managed Sq RF Hazard prgm; trained 88 on environmental mgmt--no deficiencies during PACAF ESOHCAMP

- Conducted 20 technical evals; ID'ed 10 trng shortfalls--sustained 98% up-time rate on $120M PACAF systems

- Piloted unit self insp prgm; guided 22 section reps/256 insp items--zero findings in 20 work centers during UCI

- Led a team of four evaluators to oversee the installation and acceptance of a local area network expansion project covering seven buildings; established a new precedence for positive QA involvement

- Established a highly effective material deficiency reporting and follow-up program that ensured problems were promptly reported to the proper action agencies and assisted the workcenters with repair actions

- Rebuilt the Report of Survey Monitor program and continuity book--enhanced program integrity through simplified procedures and enforcement of a strict suspense and follow-up system for assigned investigators

- Selected ahead of all Beal AFB MSgts for Titan Research Company (TRC) Quality Assurance (QA) program

- Spearheaded the flight's efforts to prepare for the merging of the squadron's equipment management software -- Ensured the testing and reporting of the status of 65 computers and other communications systems

- Directed the review and enhancement of the workcenter's basic inspection checklists to include new topics previously neglected including electrostatic discharge (ESD) protection, radiation hazards, and more

- Completed all required Quality Assurance training in record time-fully qualified in one month--outstanding effort!

- Assumed responsibility for the squadron's long-defunct ESD protection program -- Launched big improvements in the ESD practices of maintenance and non-maintenance workcenters

- Positively influenced the installation and activation of several communications-computer systems -- Completed a definitive installation and testing inspection routine on all systems to ensure peak operation

- Ramrodded inventory of workcenters; reclaimed 100+ items to the inventory system--$5M recovered

- Performed over 100 technical inspections in less than a year--ensured adherence to preventive maintenance program

- Star Quality Assurance inspector-proactively combines inspections with training-23 inspections in 6 months

- Hard hitting -persuasive strong communications skills overcame staff reluctant to accept change for workcenter

- Completed Staff Assistance Visit to Andrews AFB; recommended changes to current programs-50% improvement

- Developed Quality Assurance program at remote site; program in operation in a week! Outstanding work!

- Worked with all squadron workcenters to identifiy areas needing improvement--improved efficiency by 30%!



We need more examples. Bullet statements may be shared using the form below. Thanks, comrade!

© Copyright 2009, All Rights Reserved. Contact editor@airforcewriter.com   Use of website constitutes acceptance of terms